Kufy-LINKS

From ArduinoInfo
(Redirected from Kufy-Try1)
Jump to navigation Jump to search

Kufy - Terry BLOG

A try at replacing SLACK for just us..

JULY 2022

Let's try this out??

AUGUST 2022

Let's try this out??

OTHER / EARLIER STUFF

NEW PRODUCTS FALL 2019

DEADLINE in less than 3 weeks (September 20) to present at Champlain School Makerfaire

There are 5 possible products to develop by that time:

  • Existing MakerSpace Engineering kit (YourDuinoEngStarter)
  • Existing new design: (EasyConnectKit)
  • Redesigned Robot Kit with added features and parts, and new Physical Computing How-To
  • New BrickBits kit (Based on new Keyes lego-brick compatible modules)
  • Possible "classroom kit" using drawers similar to CIJE kits

NEW PRODUCT TASKS

What we must do for each new product to be presentable to customers:

  • Decide exact set of parts included in the kit
  • Order quantity of parts for first-pass kit build
  • Decide exact packaging / box; order boxes
  • Design and apply colorful label to product box
  • Write complete How-To chapter for students (WIKI and Printed)
  • Write Teacher material (Wiki and Printed)
  • Design software features and organization
  • Write and test software for distribution with product
  • Write promotional brochure for each product
  • Build enough samples of each kit to be able to give to potential customers


           

DISCUSSIONS

This has the PRIORITIES we are discussion:

https://arduinoinfo.mywikis.net/wiki/Kufy-ThingsToDecide

Links to other Kufy pages

KUFY: Published articles on the WIKI

Bringing in New Pages To WIKI

NONE of these are great; we need to author in WIKI pretty much...

https://en.wikipedia.org/wiki/Help:WordToWiki https://stackoverflow.com/questions/2833263/convert-from-microsoft-word-to-media-wiki-markup-style

Nigerian Power - Generators and Controls

Power in Home and businesses 230V 50 Hz. 1 Phase to smaller homes, 3 phase to businesses.

Typical home: 230V at ??? current??


https://www.huffingtonpost.com/timi-soleye/why-nigeria-generates-so-_b_5695091.html

https://www.economist.com/news/middle-east-and-africa/21693971-nigeria-has-about-much-electricity-edinburgh-problem-powerless

https://www.researchgate.net/publication/303544564_The_Erratic_Electric_Power_Supply_in_Nigeria_Causes_and_Remedy

https://en.wikipedia.org/wiki/Nigerian_energy_supply_crisis

https://ieeexplore.ieee.org/document/1257723/


Workshop Setup: Kufy - September 2019

FURNITURE / INFRASTRUCTURE

  1. Power strip(s)
  2. Bright Desk Lamp
  3. Marker board
  4. Table
  5. Chair
  6. Components Rack
  7. Book Shelve
  8. Cutting Mat Pad
  9. Backup Power/Generator

TOOLS

  1. Soldering Station
    1. Solder
  2. Soldering Helping Hand
  3. Electronics Pliers: Wire cutters, Needle Nose pliers etc.
  4. Wire Strippers
  5. screw driver set
  6. screws and nuts set
  7. Charger for 18650 batteries
  8. iPhone
  9. External Hard Disk Drive


PARTS TO DEVELOP PRODUCTS

  1. 12V 2 A 230V power supplies
  2. Line Follower
  3. Push buttons (momentary switch) with caps
  4. OptoIsolated Relays
  5. Double-sided tape
  6. Arduino Nano / Nano Sensor Shield.